California Porch

California note

Paso Robles water questions start with the account and parcel

A city water account, an existing private well, and a proposed new well follow different paths in the Paso Robles Groundwater Basin.

First ask how the property gets water. If it gets a City of Paso Robles water bill, start with that city account. The city blends water from wells near the Salinas River, Lake Nacimiento, and the Paso Robles Basin. A city customer does not start with a private-well permit.

A private well needs a parcel check. The Paso basin has four local water agencies, often called GSAs. Open the county basin map. Search with the full street address or the nine-digit parcel number. The map shows the basin and GSA lines. A Paso Robles mailing address does not settle the agency or land rules.

A new well on county land needs a permit. The owner hires a well driller with a C-57 license. That driller files the well form with Environmental Health. A farm well in the Paso basin needs one more check. Planning and Building must clear the farm-water offset rules first. A replacement well has its own exemption form.

For a sale or project, gather the parcel number and water bill or well record. Write down the planned water use. Save the basin-map result. Confirm the permit path before you count on a new well or more farm water. A nearby well does not show that the same plan is allowed on your parcel.

Where to see it

Paso Robles water-supply pages and San Luis Obispo County's basin map, well permits, and agricultural-well review.

Official sources

Official pages

Reviewed July 28, 2026

Current rules, forms, fees, deadlines, maps, and office instructions.

Rules, forms, fees, deadlines, and office procedures can change. Check the current page before you file, pay, or rely on a date.

Connected places

Open the local directory

Related notes

Related California notes

Page feedback

See something wrong or unclear?

Send a note about this page. The page address will be included automatically.

Send a note